门吊提升第三日

早上进厂就发现门吊高了,不知是昨天提升的还是昨晚或今早提升的。

ph20080605074151.jpg

早上7:42,总厂望向码头方向

ph20080605115809.jpg

中午11:58,码头望向总厂方向

ph20080605132732.jpg

下午1:27,总厂望向码头方向

ph20080605132923.jpg

同上,下午1:29,总厂望向码头方向

ph20080605165130.jpg

下午4:51,码头望向总厂方向

ph20080605170429.jpg

下午5:04,总厂望向码头方向

刚性腿已经支起来了,剩下两只柔性腿没支。